Electricity

Making a connection  

New user, or a user that increases the amount of ordered power, has to pay to the system operator the network charge for the connected load (Article 72.a of the Energy Act). In addition, the user has to pay the direct costs for a connection. 
New user, or user that increases the amount of ordered power, has to pay to the system operator the costs for the connection to its network. The connection price includes the direct connection costs related to making a connection and a connection.
In the case of the producers from renewable sources and/or cogeneration of heat and electricity the costs of the connection are covered by the owner of investor. The costs of any electricity network reinforcement or modification of the network, due to the connection of such power plants are covered by the system operator. These costs include the necessary studies and analyses (Article 70 of the EA).
When connecting a power plant causes disproportional costs, the connection can only be made if the owner, or the investor, covers these costs. The producers of electricity from renewable sources and/or the cogeneration of heat and electricity cover only a part of the disproportional costs. The system operators of the transmission and distribution networks produce and publish the rules for the division of the costs for the network reinforcement. When preparing these rules the operators take into account all the network users making use of a connection (Article 71 of the EA).

 

Network charge for a connection in years 2013, 2014 and 2015

The amount of the average cost of making a connection that a user has to pay before obtaining a connection to an electricity network is defined with the product of the power ordered, and the average cost of making a connection for a consumption group....
more »

 

Procedure for connecting a new customer to a distribution network for electricity

A user submits a filled-in application for obtaining a connection approval for a new customer to a distribution company...